Aladinss
AD

Rj Construction in Chennai

Description

Rj Construction uses Mivan aluminium formwork for Chennai high-rises, completing 1 floor in 7 days. We pin panels, pour M40, and strip after 24 hrs. Our walls need no plaster. See our G+25 tower on Connect on social media.

No google 360 Found!

NO PRODUCT FOUND!

Write a Review

NO JOBS FOUND!

Frequently Asked Questions

2500 sqm formwork, 4-day cycle—pour day 1, strip day 2, clean day 3, fix day 4—1 floor every 7 days vs 21 days plywood.

4mm Al panel with slotted edge, 12mm steel pin, plastic wedge locks in 5 sec—100 reuses, no rust, perfect alignment.

43-grade cement, 10mm aggregate, superplasticizer—gains 25 MPa in 24 hrs, allows early stripping, no props after 12 hrs.

Panel face gives class 1 finish, joints filled with polymer, direct putty paint—saves 15 days and 20% cost per floor.

Panels designed for 250 cycles, we track with barcode, repair corners—cost per use drops to Rs 15/sqft after 100 uses.

No tags available

Click for a Quick Look on