Friction and end-bearing combined
Auto-leveling 150T crane
Ramp-crane-reaction frame method
Bentonite slurry recirculation
PIT with cross-hole sonic logging
From 600mm for bungalows to 1500mm for 50-storey towers, selected based on structural loads and soil report.
Typically 25-45m or until N-value >100 in SPT, socketed 1D into rock for end bearing.
Apply 2.5 times working load using kentledge or anchor piles, measure settlement <12mm at 1.5x load.
No vibration, low noise, bentonite controls collapse—ideal near existing homes or hospitals.
Yes, low-strain PIT for all, CSL for 10% random piles to detect necking or voids.