Aladinss
AD

Dd Construction in Perambur

Description

Safely brought down 15-storey, now Dd Construction in Perambur does controlled demolition. Implosion 0.5 sec, diamond wire saw, 30 ton breaker, 90% recycle. Visit our Perambur site during Open daily from 9:30 am to 6 pm (Sunday closed), call Contact us for details for blast hole, or follow Connect on social media for wire cut.

No google 360 Found!

NO PRODUCT FOUND!

Write a Review

NO JOBS FOUND!

Frequently Asked Questions

0.5 sec delay, 500 hole, 50 kg charge, vibration <5 mm/s, 200m exclusion, dust net.

0.8mm diamond, 50 m/min, water cool, cut 3m thick, zero vibration.

30 ton excavator, 4000 joule, 300 mm bite, silent type, 3 cube/hour.

90% concrete crush 40mm, rebar melt, wood chip, plastic granulate, sell local.

45 days – survey 7, prep 15, blast 1, clear recycle 22 days.

No tags available

Click for a Quick Look on