Aladinss
AD

Jalas Construction in Aminjikarai

Description

Jalas Construction builds 50 acre logistic hub in Aminjikarai with cross dock, cold chain, and racking 15 m. 24 months rail siding. Free flow plan Open daily from 9 am to 5 pm (Sunday closed), mail for cold panel, follow Connect on social media for truck bay.

No google 360 Found!

NO PRODUCT FOUND!

Write a Review

NO JOBS FOUND!

Frequently Asked Questions

ASRS crane 30 m/min, WMS software, barcode; put away 400 pallet/hour.

-18°C ±1, rack 12 m, EVA floor, rapid door; ammonia 2 stage compressor.

2 rake simultaneous, 40 ft container, level crossing; PFT approval, crane 40 ton.

Inbound 50 bay, outbound 50, sortation conveyor; 500 parcel/hour, scan weigh.

HSD 20 KL, canopy 30 bay, air water; package 2.5 crore, PESO license.

No tags available

Click for a Quick Look on