We cast 400 panels in factory, deliver 100/day, crane erects 100m/day—complete 1200m boundary with gate in 3 working days vs 30 days brick wall.
50mm panel with 4mm prestressed wires and two 8mm main bars takes 500 kg impact, resists 40 kg/sq.m wind, and lasts 25 years without cracks.
600mm deep x 300mm wide strip in M25 with 1% steel, filled with PCC—transfers load to soil, prevents overturning even in loose fill.
10-ton mobile crane with 4-point sling lifts 1.5-ton panel, places in post grooves, wedges with M30 grout—perfect plumb in 2 minutes per panel.
Six lines of 12 gauge GI barbed wire on 45° Y-angles 600mm above wall, spaced 100mm—deters climbing, rust-proof, and meets factory safety audit.